TM 10-3930-669-34 13-3.  CARRIAGE REPLACEMENT/REPAIR. This task covers: a. Removal c. Cleaning/Inspection e. Installation b. Disassembly d. Assembly INITIAL SETUP Tools and Special Tools Personnel Required Tool Kit, General Mechanic’s: Automotive Two (Item 1, Appendix E) Lifting Device, Minimum Capacity 3000 lbs Equipment Condition (1814 kg) Mast removed (Para 13-2) Materials /Parts Solvent, Dry-cleaning (Item 20, Appendix B) Nut, Lock (2) Pin, Cotter (4) Screws, Lock (4) a. Removal (1) Remove four cotter pins (1), two pins (2), and primary chains (3) from anchors (4).  Discard cotter pins. (2) Position two primary chains (3) under carriage (5). 13-27

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business