TM 10-3930-664-24 12. CONNECT   HOSE   ASSEMBLIES   (35,   36,   37, 38) WITH FITTINGS TO INTERMEDIATE RAIL MANIFOLD (30). a. Install  adapter  (48)  and  new  O-ring  (49) into intermediate rail manifold (30). b. Connect   hose   assembly   (47)   to   adapter (48) and bottom of main lift cylinder. c. Install  adapters  (43,  44)  and  new  O-rings (45,    46)    into    top    of    intermediate    rail manifold (30). d. Install  adapters  (39,  40)  and  new  O-rings (41,   42)   into   sides   of   intermediate   rail manifold (30). e. Connect hose assemblies (35, 36, 37, 38) to intermediate rail manifold (30). 13. CONNECT HOSE ASSEMBLIES (28, 29) WITH FITTINGS TO ROTATE MANIFOLD (15). a. Install    fittings    (32)    into    rotate    manifold (15). b. Install         bulkhead         fitting      (31)         and bulkhead elbow (33) onto sideshift bracket (34) using nuts. c. Carefully  feed  hose  assemblies  (28,  29) over freelift chain roller. d. Connect    hose  assemblies    (28,    29)  to fittings (31, 32) and elbow (33). 2-432

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business