TM 10-3930-664-24 2-137.    FLOOR PLATE REPLACEMENT This task covers: Removal, Cleaning, Inspection, and Installation INITIAL SETUP: Tools and Test Equipment: Equipment Condition: General Mechanics Tool Kit (1, App E) Floor mat removed (para.  2-135) Steering selector valve removed Personnel Required: (para 2-122) Tool box removed (para.  2-140) 2 Personnel A.    REMOVAL 1. REMOVE HOSES AND HOSE CLAMPS FROM BOTTOM OF FLOOR PLATE (23). NOTE The following clamp removal procedures are for typical clamp arrangements.  Individual clamp assembly components  may  vary.    Tag  hoses  and  clamps  to  eliminate    confusion  during  installation.    Loosely assemble components after removal to prevent  loss. a. Remove two bolts (1), cover plate (2), and two-piece tube clamp (3).    Separate clamp and remove hose. b. Remove two stacking bolts (4), locking plate (5), and two-piece tube clamp (3)  from bottom of floor plate (23).  Separate clamp and remove hose. c. Remove bolt (6), cover plate (7), and two-piece tube clamp (8).    Separate clamp and remove hoses. d. Remove stacking bolt (9), locking piece (10), and two-piece tube clamp (8) from bottom of floor plate (23)   Separate clamp and remove hoses. e. Remove two bolts (12), cover plate (13), and two-piece tube clamp (14).    Separate  clamp and remove hose. f. Remove two stacking bolts (15), locking plate (16), and two-piece tube clamp (14)  from bottom of floor plate (23).. Separate clamp and remove hose. g. Remove two bolts (17), cover plate (18), and two-piece tube clamp (11).    Separate clamp and remove hose. 2. REMOVE BOLTS (19), CLAMP (20), WASHERS (21), AND NUTS (22) THAT SECURE FLOOR PLATE (23) TO FORKLIFT CHASSIS. 2-366

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business