TM 10-3930-664-24 B. INSTALLATION 1. Place floor jack beneath counterweight (1). Raise jack  to support counterweight and move counterweight   into   place for installation. 2. Install   counterweight   (1)   onto   forklift   frame   using nuts  (4),  washers  (3),  bolts  (2),  and  clamp  plates (5). 3. Torque  nuts  (2)  in  two  steps;  100  ft-lbs  (135  Nm), then 220 ft-lbs (298 Nm). FOLLOW-ON MAINTENANCE: None END OF TASK 2-336

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business