TM 10-3930-664-24 2-90.  SLAVE RECEPTACLE REPLACEMENT This task covers: Removal, Cleaning, Inspection, and Installation INITIAL SETUP: Tools and Test Equipment: Materials / Parts: General Mechanics Tool Kit (1, App.  E) Loctite 242 (20, App.  C) A.  REMOVAL WARNING Electrical shock hazard.    Disconnect  battery  ground cable or power source prior to working on electrical components.    Failure  to  heed  warning  could  cause shock,  injury  or  death.    If  electrical  shock  occurs, administer   first   aid   and   seek   medical   assistance immediately. 1. Remove top transmission cover (1) by removing nine screws (2) and washers (3). 2. Tag electrical wiring.  Remove cables and wiring from  slave  receptacle  (5)  by  removing  screws (6). 3. Remove  cap  (4).    Remove  slave  receptacle  (5) from     side     transmission     cover     by     removing screws (7) and nuts (8). B.  CLEANING Clean slave receptacle in accordance with paragraph 1- 24. C.  INSPECTION Inspect receptacle and related components in accordance with paragraph 1-24. 2-256

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business