Quantcast INSTALLATION - TM-10-3930-664-24_256
Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
TM 10-3930-664-24 D.  INSTALLATION 1. Install engine oil pressure sender (4) into tee (6). 2. Install  electrical  wire  (3)  on  engine  oil  pressure sender (4) using nut (5). 3. Close  hood  assembly  (2).    Ensure  handle  (1)  is fully engaged. FOLLOW-ON MAINTENANCE: Connect   battery   cables   (para.      2-78) Raise towbar and lock in position  (para. 2-126) END OF TASK 2-207

Integrated Publishing, Inc.