Quantcast INSTALLATION - TM-10-3930-664-24_219
Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
TM 10-3930-664-24 5. POSITION  ALTERNATOR  (1)  FOR  CORRECT BELT    ALIGNMENT.    INSTALL  LINK  SCREW (10). 6. TORQUE    SCREW    (10)    TO    32    FT-LBS    (43 N•m).    TORQUE  SCREW  (11)  TO  18  FT-LBS (24 N•m). 7.    CONNECT ELECTRICAL WIRING TO ALTERNATOR (1). a. Connect red wire (2) and black wire (3) to terminal (4). b. Connect black wire (5) and green wire (6) to terminal (7). c. Connect black wire (8) to screw (9) which secures    suppression    capacitor    (2)    to alternator (1). FOLLOW-ON MAINTENANCE: Install drive belt (para.  2-54) Connect battery cables (para.  2-78) END OF TASK 2-170

Integrated Publishing, Inc.