TM10-3930-660-34 16-12.3.  OUTER BOOM - REPLACE/REPAIR (Cont’d) a. Remove two capscrews (16), two lockwashers (17), and one clamp cover (18) from each pair of clamp halves (19).  Discard lockwashers (17).  Note location and orientation of clamp halves (19) for use during installation. b. Remove three capscrews (20), three lockwashers (21), and one clamp cover (22), from each pair of clamp halves (23).  Discard lockwasher (21).  Note location and orientation of clamp halves (23) for use during installation. c. Remove three lines (4) from underside of outer boom (3). CLEANING See Cleaning Instructions, para.  2-10. INSPECTION See Inspection Instructions, para.  2-11. ASSEMBLY IF NECESSARY, INSTALL THREE LINES (4) TO UNDERSIDE OF OUTER BOOM (3). NOTE Lines (4) are not interchangeable.  Install lines (4) in locations noted during removal. a. Position three lines (4) on underside of outer boom (3). NOTE Apply Loctite 242 to capscrews (20) and (16) as installed. b. Install one clamp cover (22), three new lockwashers (21), and three capscrews (20) to each pair of clamp halves (23).  Ensure that clamp halves (23) are positioned as noted during disassembly. 16-85

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business