Quantcast ASSEMBLY - CONTINUED -832450619

 

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
ASSEMBLY -832450618
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
HYDRAULIC JOYSTICK CONTROL VALVE MAINTENANCE
TM 10-3930-660-24-2
MLRS ATTACHMENT CONTROL VALVE MAINTENANCE - CONTINUED
0304 00
ASSEMBLY - CONTINUED
21.
Install poppet (12), spring retainer (11), spring (10),
12
11
2
shim (9) and adjusting screw (8) into body (2).
1
5
22.
Install one new O-ring (7) in each nut (5 and 6).
4
3
23.
Install nuts (5 and 6).
24.
Install nut (1) onto body (2).
7
25.
Install new O-rings (3 and 4) on nut (1).
6
7
26.
Install relief valve as an assembly. Torque relief valve
9
10
8
to 22-28 lb-ft (30-38 Nm).
409-1379
27.
Install MLRS attachment control valve (WP 0176 00).
28.
Operate equipment, check for proper operation and leaks (TM 10-3930-660-10).
END OF WORK PACKAGE
0304 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.