Quantcast ASSEMBLY - CONTINUED -832450610

 

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
ASSEMBLY - CONTINUED -832450609
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
MAIN CONTROL VALVE ASSEMBLY MAINTENANCE
TM 10-3930-660-24-2
TANDEM GEAR PUMP MAINTENANCE - CONTINUED
0302 00
ASSEMBLY - CONTINUED
CAUTION
If parts are difficult to fit during assembly, tap with a soft hammer. Use care to prevent part damage.
20.
Ensure that dowel pins (5) are in place. Install cover (4) onto gear housing (6). Align dowel holes over dowel pins (5).
Use a soft hammer to tap parts together. Use care to prevent damage to new seals (19).
3
18
26
25
24
5
25
26
6
23
20
17
21
1
22
19
2
6
4
19
409-1373
409-1370
NOTE
27
32
38
Studs should be flush with shaft end of end
39
34
3
cover.
30
21.
Install four studs (3) through all housings and into end
28
cover (30).
37
22.
Install four washers (2) and nuts (1). Finger-tighten
35
alternately.
33
23.
Rotate pump shaft to ensure there is no binding. After
31
36
nuts (1) are tight and there is no binding, torque to 200
lb-ft (271 Nm).
31
24.
Install tandem gear pump (WP 0173 00).
21
25.
Operate engine, check for proper operation and leaks
29
(TM 10-3930-660-10).
409-1374
END OF WORK PACKAGE
0302 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.