Quantcast INSTALLATION - CONTINUED -832450347

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION -832450346
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
INSTALLATION - CONTINUED -832450348
TM 10-3930-660-24-2
OUTER BOOM MAINTENANCE - CONTINUED
0264 00
INSTALLATION - CONTINUED
6.
Connect rod ends of boom hoist cylinders (8) to outer boom (3).
7.
Reposition slings to front of outer boom (3).
8.
Lift outer boom (3) until cylinder pivot pin holes of boom (3) are just above cab.
9.
Lift and support boom hoist cylinders (8).
NOTE
One boom hoist cylinder will begin to extend before the other. Install this cylinder first. Second cylinder will
begin to extend after first cylinder is connected.
10.
Start engine. Use joystick to extend boom hoist cylin-
der (8) until cylinder rod eye is aligned with pivot pin
hole of boom. Stop engine (TM 10-3930-660-10).
NOTE
Apply antiseize compound to pivot pin as
installed.
11.
Install and secure pivot pin (9) to outer boom (3) with
capscrew (10) and new locknut (11).
12.
Repeat steps 10 and 11 for other boom hoist cylinder
(8).
13.
Start engine and raise outer boom (3) as required for
access to lines (4). Stop engine (TM 10-3930-660-10).
10,11
9
3
8
409-1428
0264 00-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.