Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
STE/ICE-R WIRING HARNESS MAINTENANCE - CONTINUED
0234 00
REMOVAL
NOTE
Tag all electrical leads before removing to ensure correct installation.
1.
Remove cover (1) from diagnostic connector (2) of STE/ICE-R wiring harness (3).
2.
Remove four nuts (4), lockwashers (5), washers (6), screws (7), chain of cover (1) and diagnostic connector (2).
3.
Remove four nuts (8), lockwashers (9), screws (10) and STE /ICE-R resistor connector (11). Discard lockwashers.
4.
Disconnect ring terminal (12).
5.
Remove nut (13), lockwasher (14), one ring terminal (15) and washer (16). Discard lockwasher.
6.
Disconnect two additional ring terminals (15).
7.
Disconnect three ring terminals (17).
8.
Disconnect two ring terminals (18).
9.
Disconnect ring terminals (19, 20 and 21).
10.
Disconnect connectors (22, 23, 24 and 25).
11.
Remove 12 tiedown straps that secure STE/ICE-R wiring harness (3) and remove harness.
TESTING AND INSPECTION
1.
Using an ohmmeter, check continuity of individual wires suspected of being open. Identify wire ends by the markers.
2.
Check connectors (2, 11, 22, 23, 24 and 25) for loose or broken pins.
3.
Check ring terminals for poor joints with wire and other defects.
INSTALLATION
1.
Position STE/ICE-R wiring harness (3) and connect connectors (22, 23, 24 and 25).
2.
Connect ring terminals (19, 20 and 21).
3.
Connect two ring terminals (18).
4.
Connect three ring terminals (17).
5.
Connect two ring terminals (15).
6.
Install additional ring terminal (15) with washer (16), new lockwasher (14) and nut (13).
7.
Connect ring terminal (12).
8.
Install STE/ICE-R resistor connector (11) with four screws (10), new lockwashers (9) and nuts (8).
9.
Install diagnostic connector (2) and chain of cover (1) with four screws (7), washers (6), new lockwashers (5) and four
nuts (4).
10.
Install cover (1) to diagnostic connector (2).
11.
Secure STE/ICE-R wiring harness (3) with 12 tiedown straps.
12.
Install STE/ICE-R resistor (WP 0086 00).
13.
Connect battery cables (WP 0107 00).
0234 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business