Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
BOOM ELECTRICAL CABLE REPLACEMENT - CONTINUED
0233 00
INSTALLATION - CONTINUED
19.
Install new tie strap (34) to end of sleeve (35) inside
boom.
20.
Install clamp halves (33), cable guide bracket (32),
29
two new lockwashers (31) and two capscrews (30) to
secure cable (12) to boom.
12
21.
Plug boom electrical cable (12) into connector (29).
22.
Check for proper installation of boom electrical cable
33
(12).
23.
Connect batteries (WP 0107 00).
31
33
30
32
24.
Start engine.
35
34
12
25.
Test all boom and attachment functions to ensure
proper cable installation.
409-428
26.
Check that cable and hoses track properly in the boom.
27.
Check boom hose and cable tension and adjust, if necessary.
28.
Position cover (28) on rear of outer boom and secure
with four new lockwashers (27) and four capscrews
(26).
28
26 27
409-426
29.
Install load backrest to MLRS attachment, if removed (TM 10-3930-660-10).
30.
Operate boom and check for proper operation (TM 10-3930-660-10).
END OF WORK PACKAGE
0233 00-7/(-8 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business