Quantcast INSTALLATION - CONTINUED -832450167

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION -832450166
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
BOOM ELECTRICAL CABLE REPLACEMENT
TM 10-3930-660-24-2
MAIN WIRING HARNESS REPLACEMENT - CONTINUED
0232 00
INSTALLATION - CONTINUED
4.
Connect ground terminal rings (6 and 7), install five nuts (12), five new lockwashers (13) and five flatwashers (14).
5.
Connect four terminal rings (4), two terminal rings (5), eight terminal rings (6), terminal ring (7), twelve terminal rings
(8), terminal ring (9), terminal ring (10), terminal ring (11) and terminal ring (24) to devices indicated.
6.
Plug in 25 male connectors (1), three spade terminals (2) and female receptacle (3) to devices indicated.
7.
Connect battery cables (WP 0107 00).
1
2
1
4
19
1
15,16,17,18
20
1
5
23
A
2
8
6
8
7  VEHICLE GND.
6
10
9
11
1
6
8
24
12
13
6
6,7
15,16,17,18
19
14
1
4
409-1124
1
END OF WORK PACKAGE
0232 00-5/(-6 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.