Quantcast INSTALLATION - CONTINUED -832450140

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - CONTINUED -832450139
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
FUEL SHUTOFF SOLENOID REPLACEMENT (152 HP)
TM 10-3930-660-24-2
FUEL INJECTOR PUMP REPLACEMENT (165 HP) - CONTINUED
0225 00
INSTALLATION - CONTINUED
14.
Install elbow (9) to fuel injection pump (7). Connect
hose (8) to elbow.
15.
Install tee (4) to fuel injection pump (7).
16.
Install adapter (6) to tee (4). Connect hose (5) to
adapter.
4
17.
Install elbow (3) to tee (4). Connect hose (1) to elbow
1
5
1 2
and tighten hose (1) to elbow and tighten hose clamp
2
(2).
1
TR00003
3
5
TR00003
18.
Install accelerator cable (WP 0049 00).
6
5
3
19.
Install STE/ICE-R pulse tachometer and drive assem-
3
7
bly (WP 0089 00).
8
2
9
6
5
20.
Connect high pressure fuel tubes (WP 0035 00).
4
6
5
4
21.
Connect fuel supply tubes (WP 0039 00).
7
7
22.
Connect fuel drain tubes (WP 0037 00).
8
9
8
23.
Connect fuel shut-off solenoid (WP 0021 00).
9
409-4092
TR01050
409-4092
409-4092
TR01050
24.
Operate equipment and check for leaks and proper operation (TM 10-3930-660-10).
END OF WORK PACKAGE
0225 00-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.