Quantcast INSTALLATION - CONTINUED -832450138

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - CONTINUED -832450137
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
INSTALLATION - CONTINUED -832450139
TM 10-3930-660-24-2
FUEL INJECTOR PUMP REPLACEMENT (165 HP) - CONTINUED
0225 00
INSTALLATION - CONTINUED
8.
Reposition timing pin (25) in fuel injection pump (7).
TIMING PIN
HOLE
9.
Remove plug (26), sealing washer (27) and timing pin
(25) from fuel injection pump (7). Discard sealing
TIMING
washer.
TOOTH
10.
Reverse position of timing pin (25) so the slot in pin
27
will fit in the over timing tooth in fuel injection pump
26
(7).
11.
Install plug (26) and new sealing washer (27).
25
7
4T9-01054
0R 1814
12.
Torque nut (15) to 66 lb-ft (89 Nm).
16
15
17
7
409-1812
0225 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.