Quantcast INSTALLATION -832450136

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
REMOVAL - CONTINUED -832450135
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
INSTALLATION - CONTINUED -832450137
TM 10-3930-660-24-2
FUEL INJECTOR PUMP REPLACEMENT (165 HP) - CONTINUED
0225 00
INSTALLATION
1.
Push in engine timing pin (14) to verify top dead cen-
ter for no. 1 cylinder. If necessary, rotate engine coun-
terclockwise at universal joint of transmission input
shaft while assistant pushes on engine timing pin.
NOTE
Verify TDC by examining marks on flywheel
housing and flywheel housing coupling. If nec-
essary, align marks by turning engine.
2.
Install fuel shut-off solenoid and bracket (WP 0226
14
409-1811
3.
Install mounting bracket (21) and two screws (24) on fuel injection pump (7).
4.
Install fuel injection pump (7) and four nuts (22) on timing gear housing studs (23). Torque nuts to 32 lb-ft (43 Nm).
5.
Install screw (19) on mounting bracket (21) and bracket (20).
7
7
21
24
23
22
20
19
18
409-4093
0225 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.