Quantcast INSTALLATION - CONTINUED -832450130

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - CONTINUED -832450129
Up
TM-10-3930-660-24-2 Truck Forklift; 6 000 lb. Variable Reach Rough Terrain Manual
Next
FUEL INJECTOR PUMP REPLACEMENT (165 HP)
TM 10-3930-660-24-2
FUEL INJECTOR PUMP REPLACEMENT (152 HP) - CONTINUED
0224 00
INSTALLATION - CONTINUED
17.
Install hub (11) on shaft (12).
18.
Install new seal (10) and cover (6).
19.
Install new gasket (9), drive (2), two screws (7) and
two flatwashers (8).
10
9
8
7
12
2
11
6
409-1056
20.
Install tachometer (1) on drive (2) and tighten nut.
21.
Connect male connector (3) to female connector (4)
on wiring harness (5).
1
2
3
4
5
409-4121
22.
Install vibration damper (WP 0275 00).
23.
Connect battery cables (WP 0107 00).
24.
Bleed fuel lines (WP 0223 00).
25.
Start engine and check for proper operation and leaks (TM 10-3930-660-10).
END OF WORK PACKAGE
0224 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.