TM10-3930-660-20 8-7. GAUGES - REPLACE (Cont’d) b. c. Tag meter electrical leads (6) at terminals of meter (3) as required. Remove nuts (7), starwashers (8) and meter electrical leads (6) from terminals of meter (3) as required. 3. REMOVE METER (3) FROM INSTRUMENT PANEL  (1). a. Remove two nuts (9) , two starwashers (10) and clamp (11) from instrument panel (1). b. Slide meter (3) out of mounting hole on instrument panel (1). INSTALLATION 1. INSTALL METER (3) TO INSTRUMENT PANEL (1). a. b. Slide meter (3) in through mounting hole on instrument panel (1). Position clamp (11) on instrument panel (1) and secure with two new starwashers (10) and two nuts (9). 2. CONNECT ELECTRICAL LEADS AT METER (3). a. b. c. Position meter electrical leads (6) on terminals of meter (3) as tagged. Secure meter electrical leads (6) to meter (3) with new starwashers (8) and nuts (7). Connect meter light electrical lead (4) at spade connectors (5). 3. LOWER AND SECURE INSTRUMENT PANEL RIGHT-HAND (1). a. Apply (2)  . b. 4. Lower and align right-hand instrument  panel  (1). Loctite 242 to threads of capscrews Secure right-hand instrument panel (1) with four capscrews (2). CONNECT NEGATIVE BATTERY CABLE, PARA.  8-44. 8-17

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business