TM1-3930-660-10 1.  Loosen  the  wing  nuts  on  the  MLRS  lifting  tool.  Remove  the  tool  from  the  pod  and  set  it  on  top  of the  stop  tube.  Move  the  tool  so  that  the  hooks  engage  the  attaching  loops  on  vehicle  frame. Tighten  the  wing  nuts  on  the  lifting  tool  which  secure  it  and  the  stop  tube  to  the  vehicle  frame. 2-14.   INSTALLING   THE   LOAD   STABILIZERS. The  6KVRRTFL  can  be  used  to  transport  MLRS  pods  from  one  area  to  another.  The  load  stabilizers must  be  attached  if  the  pods  are  to  be  carried  more  than  a  short  distance  over  rough  terrain.  To  attach the   load   stabilizers,   proceed   as   follows: a.  With  a  MLRS  pod  attached  to  the  lifting  tool,  use  the  hydraulic  joystick  control  to  raise  the  load approximately   one   foot   off   the   ground. b.   Remove   the   load   stabliizers   from   the   vehicle   tool   box. NOTE Load  stabilizers  are  marked  “RH”  and  “LH”.  Install  the  load  stabilizer marked  “RH”  to  the  right-hand  side  of  the  fork  carriage.  Install  the  load stabilizer  marked  “LH”  to  the  left-hand  side  of  the  fork  carriage. c.  Attach  the  load  stabilizers  to  the  left  and  right  side  of  the  MLRS  pod  as  follows: (1) (2) (3) (4) Place  stabilizer  hook  through  MLRS  pod  lifting  eye. Put  end  of  handle  in  locking  notch  of  fork  carriage. Lift  handle  up  to  secure  pod. Align  locking  bar  with  holding  pin  hole  in  fork  carriage. 2-38

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business