TM 10-3930-659-20 17-26.    FORK SPACING CYLINDER HOSES AND LINES REPLACEMENT. This Task Covers: a. Removal b. Installation Initial Setup: Equipment Conditions: Materials/Parts: Parking brake set (see TM 10-3930-659-10). •  Rags (Item 27, Appendix C) Frame locking bar Installed (see TM 10-3930- •  Marker tags (Item 33, Appendix C) 659-10). •  Six preformed packings Front bottom guard removed (see paragraph 14-9). Loader frame cover removed (see paragraph 14-11). References: •  TM 10-3930-659-10 Tools/Test Equipment: General mechanic's tool kit (Item 44, Appendix F) NOTE Four  fork  spacing  cylinder  hoses,  lines,  and  fittings  are  removed  and  Installed  the same way.  One set of hoses, lines, and fittings Is illustrated. All  hoses  and  lines  should  be  tagged  before  removal.    Refer  to  paragraph  2-18  for tagging Instructions. A  suitable  container  should  be  used  to  catch  any  draining  hydraulic  fluid.    Ensure that all spills are properly cleaned. a. REMOVAL 1. Remove hose (13) and preformed packing (14) from fork spacing cylinder (1).  Discard preformed packing. 2. Remove hose (13) and preformed packing (10) from line (2).  Discard preformed packing. 3. Remove screw (12), plate (11), and two clamps (9) from line (2). 4. Remove screw (3) and two clamps (4) from line (2). 5. Remove hose (8) and preformed packing (7) from line (2).  Discard preformed packing. 6. Remove nut (6) and line (2) from fork/boom assembly (5). 17-82

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business