TM 10-3930-659-20 16-9. WINDOW WASHER ASSEMBLY REPLACEMENT. This task covers: a. Removal b. Installation INITIAL SETUP: Equipment Conditions: Materials/Parts: •    Battery disconnect switch in OFF position Rags item 27, Appendix C (see TM 10-3930-659-10) Two lockwashers •    Conveyorized fork attachments removed Tools/Test Equipment: from side of forklift truck (see paragraph 17-13). •    Right and left engine upper sideshields opened   • General mechanic's tool kit (Item 44, Appendix F) (see TM 10-3930-659-10). •    Left engine lower sideshield removed (see paragraph 14-16). References: •    Cab skirts removed (see paragraph 14-6). *TM 10-3930-659-10 •    Lower dash cover removed (see paragraph 14-23). •    Cab recirculating filter removed (see para- graph 14-14). NOTE All hoses should be tagged for removal. Refer to paragraph 2-18 for tagging Instructions. • A suitable container should be used to catch all draining windshield cleaning compound.   Ensure that all spills are properly cleaned. • Remove tie-down straps as necessary. a. REMOVAL 1. Disconnect hose (9) from elbow (10) and allow all windshield cleaning compound to drain from tank (3). NOTE Tank has two pumps, each located on opposite sides of tank. 2. Disconnect two engine wiring harness connectors (6) from pumps (7). 3. Remove two hoses (2 and 8) from pumps (7). 4. Remove four nuts (15), screws (5), and tank (3) from plate (1) and engine compartment. 5. Remove hose (12) from elbow (11) and pump (7). 6. Remove hose (9) from elbow (10) and pump (7). 16-28

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business