TM 10-3930-659-20 6-12.  ELECTRICAL LOAD CENTER REPLACEMENT. This Task Covers: a.  Removal b.    Installation Initial Setup: Equipment Conditions: Materials/Parts: Battery disconnect switch in OFF position (see •  Marker tags (Item 33, Appendix C) TM 10-3930-659-10). •  Four lockwashers Air compressor assembly removed (see para- graph 20-1). References: Tools/Test Equipment: •   TM 10-3930-659-10 General mechanic's tool kit (Item 44, Appendix F) NOTE All  wires  should  be  tagged  before  removal.    Refer  to  paragraph  2-18  for  tagging Instructions. Refer to wiring diagrams for assistance (see paragraph 6-73). a. REMOVAL 1. Disconnect two connectors (6 and 7) from starter relay (2). 2. Remove screw (1), clip (9), and terminal lead (8) from starter relay (2). 3. Remove two nuts (5), screws (3), and starter relay (2) from load center plate (4). TA707727 6-36

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business