TM 10-3930-659-20 5-25. ENGINE IDLE SPEED AND SPEED CONTROL LINKAGE ADJUSTMENTS (Con't). b. SPEED CONTROL LINKAGE ADJUSTMENT 1. With accelerator pedal (13) at idle position, remove nut (5) and accelerator cable (7) from fuel injection pump lever (4). 2. Adjust accelerator cable (7) by turning nut (12) until fuel injection pump lever (4) has movement of 0.08- 0.16 In. (2.03-4.06 mm) at idle position. 3. Install accelerator cable (7) on fuel injection pump lever (4) with nut (5). 4. Apply accelerator pedal (13) until fuel injection pump lever (4) contacts high idle stopscrew (6) on fuel injection 5. Hold  accelerator  pedal  (13)  in  high  idle  position  and  adjust  accelerator  pedal  stopscrew  (14)  until  it contacts accelerator pedal.  Release accelerator pedal. 6. Lower accelerator pedal stopscrew (14) until a movement of 0.09-0.16 in.  (2.29-4.06 mm) is obtained at fuel injection pump (11). Close right engine upper sideshield (see TM 10-3930-659-10). Install conveyorized fork attachments on side of forklift truck (see paragraph 17-13). TA706898 5-74

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business