TM 10-3930-659-20 22-8. PREPARATION OF EQUIPMENT FOR AIR SHIPMENT (Con’t). 12. Remove on-board crane hook from cab lifting bracket and place on-board crane In stowed position (see TM 10- 3930-659-10). 13. Adjust driver's seat and steering wheel for operation (see TM 10-3930-659-10). 14. Install muffler (see paragraph 5-27). NOTE Raise forks until free of boom stop. 15. Start engine and raise forks (see TM 10-3930- 659-10). 16. Position   boom   stop   (19)   rearward   and   lower forks to ground (see TM 10-3930-659-10). 17. Shut down engine (see TM 10-3930-659-10). FOLLOW-ON TASKS: Install front windshield wiper arm (see paragraph 16-6). Install cab door (see paragraph 14-2). Install counterweight (see paragraph 13-3). TA706792 22-12

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business