TM 10-3930-653-14&P REASSEMBLY AND ADJUSTMENT Reassemble  differential  in  the  sequence  opposite  to  disassembly.    The  following  requirements  given  below  should  be observed. Reassembly should be performed in a clean orderly area and due care exercised to prevent the possibility of dirt and foreign matter entering the unit Also be careful not to damage parts when assembling them. Make certain all parts are free of dirt, foreign matter, etc.  New bearings should be unpacked just before installation.  When Installing new bearings, do not wash the grease off them. Sliding sections of each part should be lubricated with gear oil lust before installation. (1)  Drive ball bearing on cross case halves. Fig. 4-416.  Installing Ball Bearing (2)  Install  pinion  gears and  side gears on cross case half.        Adjust    the    backlash    using    thrust    plates properly. St’d backlash: 0.15-0.25 mm (0.006-0.01 in) Fig. 4-417.  Installing Pinion Gears (3)  Align shaft hole with cross case hole correctly, and install  pinion  shaft  knockout   pin   from   the   correct side. Fig. 4-418.  Installing Knockout Pin (4)    Assemble    both  cross  case  halves  with  lock  bolts. Tighten  bolts  to  the  specified  torque    evenly    and bend  tangs  of lock plates. Bolt torque: 4.8-6.4 kg-m (34.7-46.3 ft-lbs) Fig. 4-419.  Installing Ring Gear and Cross Case Halves 4 - 193

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business