D.
TRI-MAX  MAST
(CLUSTER
CYLINDER)
F. LIFT CHAIN ADJUSTMENT
REASSEMBLY
When it becomes apparent that the fork carriage is not
1. Carefully insert too inner mast section within the
level, that the lift chains are loose, or that the forks are
intermediate mast section.
higher than 1/4" to 1/2" above the floor when the lift
cylinder is fully lowered, then the lift chains require
adjustment.
NOTE
Ensure that all roller bearings have
Although the chain anchors are of different sizes and in
been replaced, and are shimmed if
different locations on the various types of masts, the lift
necessary.
chain adjustment remains the same, with the following
2. Carefully insert the inner/intermediate mast
exception:
sections within the outer mast section; this is
accomplished  by  reversing  the  removal
NOTE
procedure, that is, by inserting mast sections at
ALL  CLUSTER  CYLINDERS  are
the top of the outer mast.
adjusted with the PRIMARY Cylinder
FULLY extended.
3. Replace  the  channel  restraint  interlock
assembly. Replace the cylinder bracket at the
1. Position the mast assembly so it is vertical.
intermediate mast top support.
Ensure that the inner mast section and lift
cylinder are in the fully lowered position.
4. Install the cluster cylinder assembly and the
intermediate cylinder assembly (refer to TRI-
2. Loosen the chain anchor locknuts.
MAX CYLINDER CLUSTER INSTALLATION for
specific instructions).
3. Chain tension is adjusted by increasing or
decreasing the chain lengths with the adjusting
5. Replace the bearings and studs previously
nuts. Alternately tighten or loosen the chain on
removed from the top of the outer mast.
one side and then on the opposite side, until the
chains are snug, with no slack, and carriage
E. INSTALLATION
forks clear the floor within 1/4" to 1/2".
1. Using a properly rated hoist, maneuver the mast
NOTE
assembly into its relative mounting position on
Two (2) sets of chains are used in
front of the lift truck.
TRI-LIFT (and some TRI-MAX) masts,
and chain tension is adjusted with
2. Carefully Insert the mast pivot pins by reversing
adjusting  nuts  and  turnbuckles.
the REMOVAL procedure.
Adjust primary chain anchors first
until forks barely clear the floor.
3. Connect and properly secure the tilt cylinders.
Then adjust the secondary chain
anchors until chains are snug.
4. Replace hydraulic line(s,).
4. Make certain that the lift chain tension is equal
5. Refer to CARRIAGE ASSEMBLY, Topic 3, and
on each chain and that the fork carriage is level.
install carriage.
6. If applicable, replace capscrews and spacer at
carriage roller supports.
7. Replace carriage forks.
(Refer to FORK
INSTALLATION, Topic 4.)