TM  10-3930-643-34 GENERAL  SUPPORT  PROPELLER  AND  PROPELLER  SHAFTS  MAINTENANCE.  (cont) 16-3. Rear  Differential  Carrier  Assembly.  (Sheet  1  of  12) This task covers: a. Disassembly b. Cleaning/Inspection c.  Assembly d. Adjustment INITIAL  SETUP Tools Tool  Kit,  General  Mechanic’s Automotive NSN   5180-00-177-7033 Shop  Equipment,  Automotive Maintenance  and  Repair: Field  Maintenance,  Basic, Less  Power NSN   4910-00-754-0705 Shop  Equipment,  Automotive Maintenance  and  Repair: Field Maintenance NSN 4910-00-919-0076 Materials/Parts Cleaning  solvent  P-D-680 (App. C, Item 5) Clean cloth (App. C, Item 24) Permatex No. 2 (App. C, Item 26) Gear oil (App. C, Item 18) Fine emery cloth (App. C, Item 19) Soft iron wire Cotter pin (2) Lockwire Gasket Seals (1 for S/N 2000 and below) (1 for S/N 2001 and above) Torques Bolts (4) to 160 to 190 lb-ft. Bolts (10, 12, 29 and 30) to 105 to 135 lb-ft. Nut (34) to 140 to 170 lb-ft. Bolt (36) to 50 to 65 lb-ft. EQUIPMENT  CONDITION References Condition  Description Paragraph  7-8 Rear  differential  carrier  assembly removed. Go to sheet 2 16-19

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business