TM  10-3930-643-34 GENERAL  SUPPORT  PROPELLER  AND  PROPELLER  SHAFTS  MAINTENANCE. 16-2. Front and Rear Planetary. (Sheet 4 of 4) ASSEMBLY 11. 12. 13. 14. 15. 15. 16. 17. 18. 19. Using a 1-1/2” socket and torque wrench, install two bolts (16) to planetary  carrier  (17). Tighten bolts (16) to 24 to 26 lb-ft torque. NOTE The following steps are for the assembly of one gear assembly. Assembly of the remaining two gear  assemblies  is  identical. Using  snap ring pliers, install retaining  ring  (15),  spacer  (14)  and cups (13 and 12) to gears (6). cup (13 and 12) must be chilled until cups can drop into gears (6) without a press. Install cone (11), spacer (10) and cone  (9). Install items 15 thru 8 as an assembly  and  three  spacers  (7)  in planetary  carrier. Install three spacers (6) on pins (4) making sure tapered side of spacer (7) is flush with tapered portion of pin (4) Using a hammer,    install three pins (4) with spacers (6) and dowels (5) into planetary carrier. Flat of pins (4) must be toward outside of planetary  carrier. Install  three  lock  bolts  (3).  Tighten bolts (3) to 110 to 120 lb-ft torque. Using  long  round  nose  pliers,  install new lockwire (2) on vehicles S/N 2001 and above only. Install new lockwire (1). Peen the planetary housing at dowel hole to secure dowel (5) in housing. END OF TASK 16-18

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business