TM 10-3930-643-34 GENERAL  SUPPORT  TRANSMISSION  MAINTENANCE.  (cont) 15-2. Torque Converter Charging Pump. (Sheet 6 of 6) ASSEMBLY  (cont) 22. 23. 24. 25. 26. 27. 28. 29. 30. Install items 32 thru 28 as an assembly. Using a plastic hammer, install pins (27, 26, 25 and 24). Install  new  preformed  packing (23) and spacer (22) with items 27 thru 24 as an assembly. Using  snap ring pliers, install retaining ring (20), pin (19), gear (18) and retaining ring (17). Using a rubber mallet, install items 21 thru 17 as an assembly, pin (16) and gear (15) on drive side of charging pump. Install  new  preformed  packing (14) and case (13). Using a plastic hammer, install pins (11 and 12). Using an 9/16” socket and socket wrench handle,   install  new  preformed packing (10), plate (9), four bolts (8), new seals (7) and screws (6) on drive side of charging pump. Install ring (5), new gasket (4), new seal (3), flange (2) and three bolts (1). NOTE Return  M10A  Forklift  to equipment  condition. original 15-22

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business