TM  10-3930-643-34 HYDRAULIC  SYSTEM  TROUBLESHOOTING  AND  MAINTENANCE.  (cont) 12-3. Loader Control Valve. (Sheet 12 of 14) TESTING/ADJUSTING  -  TILT  BACK  CIRCUIT  RELIEF  VALVE 72. 73. 74. 75. 76. 77. 78. 79. 80. 81. Vent  hydraulic  system  pressure,  refer to  TM  10-3930-643-10. Using a 9/16” socket and socket wrench handle, remove four bolts (54) and two flange halves (55) from tilt cylinder, left side. Disconnect hose assembly (56) from tube assembly (58). Using a scribe, remove and discard preformed  packing  (57). Position new preformed packing (57) and sandwich test block on tube assembly (58), refer to Appendix D for fabrication instruction for sandwich test block. Install  new  preformed  packing  (57)  on hose  assembly  (56). Connect hose assembly (56) to sandwich test block. Using a 9/16” socket and socket wrench  handle,  install two  flange halves (55) and four Y bolts. Using a 10" adjustable wrench, install  pressure  tester  hand  pump  in sandwich test block. Start   engine   in operator’s compartment. Go to sheet 13 12-24

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business