TM 10-3930-643-34 STEERING  TROUBLESHOOTING  AND  MAINTENANCE. 9-6. Control Valve and Check Valve. (Sheet 13 of 15) INSTALLATION 83. Using a 1-1/8"   open end wrench, install new preformed packing (24) and elbow (23). 84. Using a 1-1/4"   open end wrench, tighten locknut on elbow (23). 85. Using a 1"   open end wrench, connect hose assembly (22). 86. Using a 9/16" socket and socket wrench  handle,  install  new  preformed packing  (21),  hose  assembly  (20),  two flange halves (19) and four bolts (18). 87. Using a 3/4"   open end wrench, install  new  preformed  packing  (17) and connector (16). 88. Using a connect 89. Install 90. Using a handle, (12) on compartment. 9/16" open end wrench, hose assembly (15). new tie strap (14). 1/2" socket and socket wrench install strap (13) and bolt right front of engine 91. Position check valve (11) on valve assembly (42) under right side of cab. 92. Position  new  preformed  packing (10) and hose assembly (9) on check valve (11). 93. using a 9/16" socket and socket wrench  handle,  install two  flange halves (8) and four bolts (7). 94. Install new preformed packing (6). Go to sheet  14 9-49

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business