TM  10-3930-643-34 FRONT AND REAR AXLES 7-5. Front and Rear TROUBLESHOOTING  AND  MAINTENANCE.  (cont) Planetary. (Sheet 7 of INSTALLATION  (cont) 24. Install items 16 thru 12 as an assembly in rear left side of rear axle assembly. 25. Using  a  9/16”  socket,  socket  wrench handle  and  torque  wrench,  install retainer (9) and four of 12 bolts (8). Tighten four of 12 bolts (8) to 30 lb-ft while rotating wheel assembly. 26. Using a feeler gage, measure gap between retainer (9) and end of spindle at two points and install. Average  two  measurements  to  determine shim pack thickness. Use  shim  pack equal to, but not less than, average gap dimension. 27. Using  a  9/16”  socket,  socket  wrench handle  and  torque  wrench,  remove  four bolts (8) and retainer (9). 28. Apply Loctite 262 to threads on 12 bolts (8). Using a 1/2” socket and torque wrench, install new shims (11 and 10), retainer (9) and bolts (8). Tighten bolts (8) to 40 to 45 lb-ft while  rotating  wheel  assembly. 29. Install axle shaft (7). 8) Go to sheet 8 7-30 . . .-.. -.

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business