TM  10-3930-643-34 TRANSMISSION  TROUBLESHOOTING  AND  MAINTENANCE.  (cont) 6-6. Transmission Assembly. (Sheet 5 of 12) REMOVAL (cont) 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. Using a 7/16" open end wrench, disconnect  hose  assembly  (34)  from transmission  (53). Using a 1-1/2" open end off set wrench disconnect  hose  assembly  (34a). Remove  union  (35)  and  preformed packing (36). Discard  preformed packing (36). Using a 7/8” open end wrench, disconnect hose assembly (37) from control and scheduling valve on transmission (53). Using a 13/16" open end wrench, remove  union (38) and preformed packing (39). Discard preformed packing (39). Using long round nose pliers, remove cotter pin (40) and pin (41). Discard cotter pin (40). Disconnect  clevis  (42). Using a 9/16" socket and socket wrench  handle,  remove  four  nuts  (45a) and bolts (45b). Slide grommet (45c) forward, away from bracket (50). Remove cotter pin (43) and pin (44). Discard cotter pin (43). Disconnect clevis (45). Using a 3/4"   socket  and  socket  wrench handle, remove two bolts (46), washers (47), bolts (48) and washers (49) from top of transmission (53). Remove bracket (50). Go to sheet 6 6-40

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business