FRAME AND TOWING ATTACHMENTS TROUBLESHOOTING AND MAINTENANCE. (cont) 11-2. Roll   Over   Protective   Structure.   (S/N   2000   and   below)   (Sheet   9   of   9) INSTALLATION 45. 46. 47. 48. 49. 50. 51. 52. Attach   chain   and   hoist   to   ROPS (18)  and  position  ROPS  (18)  on top   of   frame. Using   a   1-1/8”   socket,   socket   wrench handle   and   a   1-1/8”   open   and   box   end wrench,   install   ten   washers   (17), bolts   (16),   washers   (15)   and   nuts (14)   on   ROPS   (18).   Torque   ten nuts   (14)   to   920   lb-ft. Using  a  1–1/2”  socket,  socket  wrench handle   and   a   1-1/2”   open   and   box   end wrench,   install   four   bolts   (13), washers   (12   and   11)   and   nuts   (10). Torque   four   nuts   (10)   to   920   lb-ft. Using   a   9/16”   socket,   socket   wrench handle   and   a   9/16”   open   and   box   end wrench,   install   nine   washers   (9) and   bolts   (8)   in   floor   of   operator’s compartment. Torque   nine   bolts   (8) to   380   lb-ft. Using  a  9/16”  socket,  socket  wrench handle   and   a   9/16”   open   and   box   end wrench, install   nine   washers   (7) and   nuts   (6)   under   operator’s   com- partment. Torque   nine   nuts   (6) to   380   lb-ft. Remove   hoist   and   chain. Using   hoist   and   sling,   position ladder   (5). Using   a   3/4”   socket,   socket   wrench handle   and   a   3/4”   box   and   open   end wrench, install   two   washers   (4), bolts   (3),   washers   (2)   and   new locknuts  (1).  Remove  hoist  and s l i n g. NOTE Return   M10A   Forklift   to   original equipment  condition. TM   10-3930-643-20 END  OF  TASK 11-11

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business