TM   10-3930-643-20 WHEEL  TROUBLESHOOTING  AND  MAINTENANCE.  (cont) 9-2. Wheel   Assembly   and   Tire.   (Sheet   8   of   8) INSTALLATION   (cont) 26. 27. 28. 29. 30. Lubricate   new   preformed   packing   (5) with   Ru-glide   rubber   lubricant   and install   preformed   packing   (5)   in groove   in   wheel   (11).   Do   not   lubri- cate   tire   beads   or   rim   components. I n f l a t e    t i r e    ( 8 )    t o    7 5    p s i .    U s e    t i re inflater   and   long   enough   air   hose   to permit   standing   to   one   side.   If n e c e s s a r y    l i f t    t i r e    ( 8 )    a n d    s i d e    r i ng (6)   upwards   to   effect   seal   between tire   bead,   side   ring   (6)   and   new preformed   packing   (5).   Deflate   tire (8)   to   50   psi   when   tire   (8)   is   seated and   holding   air. U s i n g    1 - 1 / 8 ”    s o c k e t    a n d    t o r q ue wrench,   install   wheel   assembly and tire   (3),   16   washers   (2)   and   bolts ( 1 ) . Tighten   bolts   (1)   to   280-300 l b - f t . Remove   hoist   and   sling. Check  torques  every  10  hours  for  new machines   or   newly   installed   wheels u n t i l    t o r q u e    s t a b i l i z e s .    R e f e r    t o paragraph   3-5. NOTE Return   M10A   Forklift   to   original equipment   condition. END OF TASK 9-10

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business