TM   10-3930-643-20 BRAKE TROUBLESHOOTING AND MAINTENANCE. 8-11. Treadle,   Treadle   Valve   and   Check   Valves   (S/N   2001   and   above).   (Sheet   8 of   8) INSTALLATION 36. 37. 38. 39. NOTE Step   36   applies   to   installation of   service   brake   treadle   valve. Using   7/16”   and   5/8”   open   end wrenches,    connect   tube assemblies (14,   13,   12,   11,   10   and   9). Install   plunger   (8)   and   insulator ( 7 )    i n    l e f t    s i d e    o f    i n t e r i o r    c ab f l o o r . I n s t a l l    r o l l e r    ( 6 ) ,    p i n    ( 5 )    a nd using   long round n o s e     p l i e r s, install   new   cotter   pin   (4). Install   treadle   (3),   pin   (2)   and   new cotter   pin   (1)   in l e f t    s i d e    o f i n t e r i o r    c a b    f l o o r. NOTE Return   M10A   Forklift   to   original equipment    condition. END OF TASK 8-57

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business