TM   10-3930-643-20 ELECTRICAL SYSTEM TROUBLESHOOTING AND MAINTENANCE. (cont) 5-47. Battery  Cables.  (Sheet  6  of  6) INSTALLATION   (cont) 38. 39• 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. Connect   battery   positive   cable   (24) to   slave   receptacle. Using   a   9/16”   socket   and   socket wrench   handle,   install   washer (12) and   bolt   (11)   on   slave   receptacle. Apply   silicone   sealant   over   entire connection. Connect   ground   cable   (21)   to   slave r e c e p t a c l e. Install   washer   (10)   and   bolt   (9)   on slave    receptacle. Apply   silicone sealant   over   entire   connection. Connect   ground disconnect. Using   a   9/16” install   washer cable   (21)   to   master open end wrench, (8)   and   nut   (7)   on master   disconnect. Apply   silicone sealant   over   entire   connection. Slide   grommet   (6)   on   cable   end   (24) and   install   in   wall. Position   battery   ground   cable ( 5 ) and   connect   to  master   disconnect. Install   washer   (4)   and   nut   (3)   on master   disconnect. Apply   silicone sealant   over   entire   connection. Using   a   1/2”   box   end   wrench,   connect battery   positive   cable   (24)   and battery   ground   cable   (5)   in   battery compartment. Connect   battery   cable   (2). Close   battery   access   door (1) on c e n t e r ,    l e f t    s i d e    o f    v e h i c l e . NOTE Return   M10   Forklift   to   original equipment    condition. END   OF   TASK 5-228

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business