TM  10-3930-638-24&P 3-5. ENGINE MAINTENANCE (cont) a.  Engine  Tune-up  (cont). (3)  Fuel  Injection  Pump  Adjustments. This task covers adjustment of fuel injection pump timing, engine idle speed, and no-load governed speed. INITIAL  SETUP TOOLS EQUIPMENT CONDITION Automotive  Mechanic’s NSN  5180-00-754-0641 Paragraph Condition  Description Tool  Kit Vehicle parked on level surface, engine off, and parking brake applied. MATERIALS/PARTS 2-53c Left  and  right  side  panels  removed. Wire seal 3-5f Tachometer drive cover removed. Timing window gasket STEP LOCATION ITEM ACTION REMARKS INJECTION PUMP — TIMING ADJUSTMENT Engine  compart- a. Engine flywheel Rotate Engage  flywheel  ring  gear  teeth  with  blade ment of  screwdriver  as  shown.  Rotate  engine counterclockwise  until  pointer  in  timing hole is past 8° BTDC mark on flywheel; then rotate engine clockwise until pointer is in line with 8° BTDC mark on  flywheel b.  Timing  window  screws,  Remove cover  and  gasket 3-32

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business