TM  10-3930-638-24&P 2-28. INSTRUMENT PANEL MAINTENANCE a. Flood L.ight Switches and Circuit Breakers. This task  covers:  a.  Removal c.  Inspection b.  Cleaning d.  Installation INITIAL  SETUP TOOLS EQUIPMENT  CONDITION No. 1 Common Organiza- NSN   4910-00-754-0654 Paragraph Condition  Description tional Maintenance Tool Kit Engine  off. IGNITION switch in OFF position and MATERIALS/PARTS key  removed. Cleaning  solvent  P-D-680 2-53h Noise baffle mat removed. Clean  cloths Tie strap Silicone  rubber  sealer 2-127

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business