Click here to make tpub.com your Home Page

Page Title: ELECTRICAL SYSTEM
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-623-12
6-45. INSTALLATION.
1. Install holddown angle and hook bolts, and
tighten nuts on hook bolts only snug enough to hold
1. If installing a replacement valve, install fittings
battery in place. Do not draw them tight enough to exert
removed from original valve, if they are serviceable.
significant pressure on the battery case.
2. Screw return line pipe into return opening in side
2. Connect battery cables to posts.
of valve.
6-49. STARTER MOTOR REMOVAL.
3. Connect all hoses to valve fittings as tagged.
1. Disconnect one cable at the battery to prevent
4. Mount valve to mounting bracket with through
shorting of tools against truck frame.
bolts, lock washers and nuts. Start engine to pressurize
system, and operate valve through all its functions,
2. Disconnect and tag all electrical leads at the
checking for leaks as each line is under pressure.
starter solenoid (see figure 1-2).
5. Adjustment.  Sluggish operation of tilt and lift
3. Remove starter motor mounting screws and
cylinders may result from improper adjustment of the
washers, and take starter motor from flywheel housing.
control valve relief valve. Adjust as follows:
a. Remove pipe plug (36, fig. 6-2.1) and
6-50. STARTER MOTOR INSTALLATION.
install suitable 9-3000 psi gage having NPT male
threads.
1. Position starter motor at mounting pad on
b. Start engine (para 4-55) and operate TILT
flywheel housing.
control (para 4-53) until mast reaches limit of travel.
Hold lever in operating position and-note line pressure.
2. Install mounting bolts and washers and tighten.
Pressure should be 1650 psi.
c. If pressure is not correct, remove cap nut
3. Reconnect leads to starter solenoid.
(1) and loosen locknut (3).
d. To raise pressure, turn setscrew (4)
4. Reconnect battery cable at battery.
clockwise  and to  reduce line pressure turn setscrew
counterclockwise.
6-51. ALTERNATOR REMOVAL.
1. Disconnect wiring harness and ground lead at
6-46. ELECTRICAL SYSTEM.
front of alternator.
6-47. BATTERY REMOVAL.
2. Remove attaching screw at adjusting strap (see
figure 1-2) and screws at mounting bracket, and lift off
1. Loosen nuts which clamp cable terminals to
battery posts (see figure 3-1 ) and remove cables from
posts. Do not remove caution tag from negative cable
6-52. ALTERNATOR INSTALLATION.
terminal.
1. Position alternator on mounting bracket and
2. Remove nuts securing battery holddown angle,
install screws attaching alternator to mounting bracket
remove holddown angle and hook bolts. Carefully lift out
and adjusting strap.
battery.
2. Install drive belt on alternator pulley, and adjust
CAUTION
belt tension as given in paragraph 5-34(4).
If battery top is wet, there is probably
3. Reconnect wiring harness and ground lead to
electrolyte present which is corrosive
to metals and destructive to clothing.
Avoid contact and rinse battery freely
6-53. DISTRIBUTOR REMOVAL. The following steps
with clear water.
anticipate timing the distributor on installation.
6-48.
BATTERY INSTALLATION.
Since charging
1. Remove cover from timing mark hole(see figure
system components of this truck could be damaged if
1-2) and crank engine until timing mark is aligned with
the battery is connected in reverse polarity, be careful to
pointer.
identify the battery posts before reconnecting cables.
The ground cable is to be connected to the negative
post.
6-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business