Quantcast Figure 3-27. Secondary lift cylinder, exploded view.

 

Click here to make tpub.com your Home Page

Page Title: Figure 3-27. Secondary lift cylinder, exploded view.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 3-26. Primary lift cylinder, exploded view.
Up
TM-10-3930-620-34 Truck Lift Fork Solid Rubber Tired Wheels 6000 Capacity 180 Inch Lift Manual
Next
Reassembly. - TM-10-3930-620-340071
(2) Install tile bearing (91 on the lower end of
(7) Install the packing nut into the assembly.
the plunger assembly (8).
3-20. Secondary Lift Cylinder
(3) Carefully install the plunger assembly into
a. Removal.  Remove the secondary lift cylinder
the tube assembly).
according to paragraph 2-18.
(4) Install the stop ring (7) and tighten with a
b. Disassembly.
spanner wrench.
(1) Place the cylinder in a vise. Unscrew the
(5) Place the backup ring (6) and a new
inner packing nut (1, fig.  3-27) to remove it and its
preformed packing (5) on the packing nut (1).
attached parts.
(6) Install the wiper ring (3) and the packing
(4) in the packing nut.
1.
Inner packing nut
7. Wiper ring
13.
Preformed packing
2.
Preformed packing
8. Preformed packing
14.
Backup ring
3.
Backup ring
9. Outer packing nut
15.
Stop ring
4.
Retaining ring
10. Nylon insert (4)
16.
Bearing
5.
Bearing
11. Wiper ring
17.
Plunger assembly
6.
Inner tube assembly
12. Preformed packing
18.
Tube assembly
Figure 3-27. Secondary lift cylinder, exploded view.
3-42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.